South Bonnie Brae Street Phase 1


Geotechnical Engineering and Construction Materials Testing

Services for the 4-lane divided roadway, two bridges, embankment & concrete paving.

— 4,750 Linear Feet of Roadway 

— South Bridge - 300 Linear Feet 

— North Bridge - 1200 Linear Feet
— 74,000 Cubic Yards of Embankment Fill 
Services
— Drill Shaft Observation
— Embankment Fill
— Utility Trench Backfill
— Lime Stabilized Pavement Subgrade
— Concrete Paving